When your engineer changes a part, Redline calculates the exact switch-over date and tells procurement, production, and assembly what to do. Grounded in live ERP data.
The coordinator manually checks stock, calls procurement, chases production, and absorbs blame when something slips. Five departments. Zero system connecting them.
Redline connects to your ERP, calculates the optimal phase-in date, and generates specific actions for every department — procurement, production, assembly, service.
We're selecting 3 machine builders to join the free pilot program. Process 10-15 real engineering changes with your own ERP data. You only pay when it proves itself. No risk, no commitment until you see the results.
In engineering, the redline is the mark that says something must change — drawn in red ink directly on the vellum drawing, passed back to the designer. It is the oldest form of engineering change communication. Redline is the platform that replaces that pen with a traceable, digital process your whole team can follow.
Read our story →Book a 30-minute walkthrough. We'll process one of your real engineering changes through Redline — no slides, no generic demo.